Clean Air, Right Climate, Every Season
If you feel comfortable indoors, the ventilation system was designed right. That is exactly what we do.
- Over 10 years of experience
- 112 completed projects
- Mitsubishi Electric partner


Cool in the Heat, Warm in the Cold
FreshAir Mechanical Engineering designs, installs and supports ventilation, air-conditioning, heating and cooling systems for residential and commercial buildings. Every building gets its own solution, built with global brands.
All Services
Split, VRF or chiller: which system suits your building?
The choice depends on building size, the number of rooms and running costs.
Read MoreOur Work
Our completed projects. On every one, our own team handled every stage from design to handover.
How We Work
A simple, transparent process from design to handover.
We listen
We analyse your needs and share our experience.
We design
After our meeting we prepare a design that reflects your wishes and our experience, and explain anything unclear.
We select
We choose the right systems together and show quality differences with real examples.
We report
We test the installed system at different times of day and report the results.
Let Our Experience Speak.
“There are still many misconceptions about ventilation, heating and cooling systems. Our job is to change them through proper design and quality products.”
“We study international practice, analyse local challenges and keep our clients informed so they can make the right choice.”
“Our new engineers train continuously and gain experience on real projects. Our people policy and our approach are the key to our growth.”
Your Questions, Answered.
Are ventilation and air-conditioning the same thing?
No. Ventilation brings in fresh air and removes stale air. Air-conditioning controls the temperature. A healthy space often needs both.
What is the difference between VRF and split systems?
Split systems serve one or a few rooms; a multi-split runs up to 8 indoor units on one outdoor unit. VRF is a central system for multi-room buildings: up to 64 indoor units, each room with its own temperature.
How long does a project take?
It depends on the building and the system. Our completed projects took between 20 and 45 working days.
Do you provide support after installation?
Yes. We diagnose the fault, explain it, fix it and test the system. We then check in with you over the following week.

Let's Build Your Comfort
Tell us about your building or call us. Our engineers will propose the right solution.
Get in Touch




